Skip to content
Home
About Us
Members
Media Gallery
Forms and Documents
Measures
CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
RDP 3: Promotion of the Cultural Heritage (CLOSED)
RDP 4: Development of Green Infrastructure (CLOSED)
RDP 5: Training and Education (CLOSED)
Projects
News and Events
Contact Us
Home
About Us
Members
Media Gallery
Forms and Documents
Measures
- CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
- CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
- CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
- CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
- RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
- RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
- RDP 3: Promotion of the Cultural Heritage (CLOSED)
- RDP 4: Development of Green Infrastructure (CLOSED)
- RDP 5: Training and Education (CLOSED)
Projects
News and Events
Contact Us
Measure 2 – Strengthening a Healthy Cultural Identity – 1st Final List of Results
By
GAL Majjistral Secretary
23 Mar 2020
Uncategorized
Measure-2-1st-Final-List-of-Results
Download
Final Results – Measure 4: Development of Green Infrastructure (Batch 5)
Measure 2 – Strengthening a Healthy Cultural Identity – 2nd Preliminary List of Results