Skip to content
Home
About Us
Members
Media Gallery
Forms and Documents
Measures
CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
RDP 3: Promotion of the Cultural Heritage (CLOSED)
RDP 4: Development of Green Infrastructure (CLOSED)
RDP 5: Training and Education (CLOSED)
Projects
News and Events
Contact Us
Home
About Us
Members
Media Gallery
Forms and Documents
Measures
- CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
- CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
- CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
- CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
- RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
- RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
- RDP 3: Promotion of the Cultural Heritage (CLOSED)
- RDP 4: Development of Green Infrastructure (CLOSED)
- RDP 5: Training and Education (CLOSED)
Projects
News and Events
Contact Us
Measure 2 – Strengthening a Healthy Cultural Identity – 1st Preliminary List of Results
By
GAL Majjistral Secretary
12 Mar 2020
Uncategorized
M2 – 1st Preliminary List of Results
Download
Preliminary Results – Measure 4: Development of Green Infrastructure
Procedure for the receipt of applications during the ongoing COVID-19 outbreak