Skip to content
Gal Majjistral
  • Home
  • About Us
  • Members
  • Media Gallery
  • Forms and Documents
  • Measures
    • CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    • CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    • CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    • CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
    • RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
    • RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
    • RDP 3: Promotion of the Cultural Heritage (CLOSED)
    • RDP 4: Development of Green Infrastructure (CLOSED)
    • RDP 5: Training and Education (CLOSED)
  • Projects
  • News and Events
  • Contact Us
  • Home
  • About Us
  • Members
  • Media Gallery
  • Forms and Documents
  • Measures
    •         - CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    •         - CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    •         - CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    •         - CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
    •         - RDP 1: Restoration of assets and sites of artistic and cultural value (CLOSED)
    •         - RDP 2: Strengthening a Healthy Cultural Identity (CLOSED)
    •         - RDP 3: Promotion of the Cultural Heritage (CLOSED)
    •         - RDP 4: Development of Green Infrastructure (CLOSED)
    •         - RDP 5: Training and Education (CLOSED)
  • Projects
  • News and Events
  • Contact Us

Preliminary Results – Measure 4: Development of Green Infrastructure

By GAL Majjistral Secretary17 Dec 2019Events

Please use the link below to download the Preliminary Results for Measure 4 – Batch 4

https://www.galmajjistral.com/wp-content/uploads/2019/12/Preliminary-List-of-Results.pdf

Download PDF
INFORMATION SEMINAR TUESDAY 24 SEPTEMBER 6PM SIGGIEWI LC
Final Results – Measure 4: Development of Green Infrastructure (Batch 4)

© 2019 GAL MAJJISTRAL Foundation
Theme by Think Up Themes Ltd. Powered by WordPress.